<?xml version="1.0" encoding="UTF-8"?><rss version="2.0"
	xmlns:content="http://purl.org/rss/1.0/modules/content/"
	xmlns:dc="http://purl.org/dc/elements/1.1/"
	xmlns:atom="http://www.w3.org/2005/Atom"
	xmlns:sy="http://purl.org/rss/1.0/modules/syndication/"
		>
<channel>
	<title>Comments on: RV solar power kits</title>
	<atom:link href="http://poweredbysolarpanels.com/rv-solar-power-kits/feed/" rel="self" type="application/rss+xml" />
	<link>http://poweredbysolarpanels.com/rv-solar-power-kits/</link>
	<description>Consumer guides and industry information on solar panels, photovoltaic power systems, solar water heaters, and other solar energy products.</description>
	<lastBuildDate>Thu, 11 Aug 2011 01:54:36 +0000</lastBuildDate>
	<sy:updatePeriod>hourly</sy:updatePeriod>
	<sy:updateFrequency>1</sy:updateFrequency>
	<generator>http://wordpress.org/?v=3.2.1</generator>
	<item>
		<title>By: SAideh</title>
		<link>http://poweredbysolarpanels.com/rv-solar-power-kits/comment-page-1/#comment-1531</link>
		<dc:creator>SAideh</dc:creator>
		<pubDate>Sun, 13 Jun 2010 10:34:19 +0000</pubDate>
		<guid isPermaLink="false">http://poweredbysolarpanels.com/?p=411#comment-1531</guid>
		<description>Dear Sir, 

I kindly request price offer or the the following system.

Solar power system
Components system:
1-	photovoltaic panel.
a-	Out put power at least. 80W
b-	state technical specification of solar cell
2-	inverter. The inverter must be achieve the following specification:
a-	output voltage 220VAC 
b-	input voltage DC
c-	out put power at least 2000W.
d-	must be compatible with power solar system.
e-	Control system of each inverter.
f-	Provide with protect of over load .
g-	Provide with protect of battery.
h-	Must be provide with automatic detection of load during standby.
i-	Provide with protect of heavy discharge of battery.
j-	Provide with protect of  rise temperature and short circuit.
k-	Provide with protect of  reverse  polarity.
3-	charger controller.
a-	charge current 20A min..
b-	compatible with (UP to 900Wp) technology.
c-	Provide charge current to battery each moment (SOC system).
d-	Depend on counter principle Ah.
e-	Return to work as automatic.
f-	Provide with manual switch of load.
g-	Provide with automatic choose between 12 V or 24V.
4-	Battery.
a-	200 Ah min..
general conditions:
1-	provide technical specification of solar, inverter, charger controller and battery.
2-	Must provide the system with safety, state the standard.
3-	State the certificate of test of the solar system.
4-	The system must provide it with suitable controller to connect it to PC inorder to monitoring the system and storage the defults and provide it with LCDto read the mesurments(current, volte, frequency, real power,temperature, hours work.
5-	Solar cells will work in ambient temparature 45C°
The locations information:
We have 6 locations
First location consist of : 6 rooms the power consumption for each room is 1500W the avarge hour work is 10 hours.
 Second location consist of: 5 rooms+ one gate+one garage car. power cosumption for each room is 1500W,  the avarge hour work is 10 hours.
Consumption of gate is 300W and garage 300W
Third location consist of: 8 rooms consumption for each room is  1500W houres work 10 houre.
Fourth location consist of: 6 rooms consumption for each room is 1500W hours work 10 hours
Fifth location consist of: 4 rooms consumption for each room is 300w hours work 8 hours.
Sixth  location consist of: 2 rooms the first room  consumption is 1800W hour work 10 hours.
Second room consumption 1500W hours work 10 hours.

Regards

Saideh</description>
		<content:encoded><![CDATA[<p>Dear Sir, </p>
<p>I kindly request price offer or the the following system.</p>
<p>Solar power system<br />
Components system:<br />
1-	photovoltaic panel.<br />
a-	Out put power at least. 80W<br />
b-	state technical specification of solar cell<br />
2-	inverter. The inverter must be achieve the following specification:<br />
a-	output voltage 220VAC<br />
b-	input voltage DC<br />
c-	out put power at least 2000W.<br />
d-	must be compatible with power solar system.<br />
e-	Control system of each inverter.<br />
f-	Provide with protect of over load .<br />
g-	Provide with protect of battery.<br />
h-	Must be provide with automatic detection of load during standby.<br />
i-	Provide with protect of heavy discharge of battery.<br />
j-	Provide with protect of  rise temperature and short circuit.<br />
k-	Provide with protect of  reverse  polarity.<br />
3-	charger controller.<br />
a-	charge current 20A min..<br />
b-	compatible with (UP to 900Wp) technology.<br />
c-	Provide charge current to battery each moment (SOC system).<br />
d-	Depend on counter principle Ah.<br />
e-	Return to work as automatic.<br />
f-	Provide with manual switch of load.<br />
g-	Provide with automatic choose between 12 V or 24V.<br />
4-	Battery.<br />
a-	200 Ah min..<br />
general conditions:<br />
1-	provide technical specification of solar, inverter, charger controller and battery.<br />
2-	Must provide the system with safety, state the standard.<br />
3-	State the certificate of test of the solar system.<br />
4-	The system must provide it with suitable controller to connect it to PC inorder to monitoring the system and storage the defults and provide it with LCDto read the mesurments(current, volte, frequency, real power,temperature, hours work.<br />
5-	Solar cells will work in ambient temparature 45C°<br />
The locations information:<br />
We have 6 locations<br />
First location consist of : 6 rooms the power consumption for each room is 1500W the avarge hour work is 10 hours.<br />
 Second location consist of: 5 rooms+ one gate+one garage car. power cosumption for each room is 1500W,  the avarge hour work is 10 hours.<br />
Consumption of gate is 300W and garage 300W<br />
Third location consist of: 8 rooms consumption for each room is  1500W houres work 10 houre.<br />
Fourth location consist of: 6 rooms consumption for each room is 1500W hours work 10 hours<br />
Fifth location consist of: 4 rooms consumption for each room is 300w hours work 8 hours.<br />
Sixth  location consist of: 2 rooms the first room  consumption is 1800W hour work 10 hours.<br />
Second room consumption 1500W hours work 10 hours.</p>
<p>Regards</p>
<p>Saideh</p>
]]></content:encoded>
	</item>
</channel>
</rss>

